Plenco operates large manufacturing
and warehouse facilities in Sheboygan, Wisconsin.
The construction of these plants is the result
of the efforts of Plenco's own engineering staff
- many of whom are registered Professional Engineers.
This staff is involved in the planning, development,
installation, and continuous improvement of plant
equipment. These units are capable of producing
resin products under strict process control as
well as molding materials with a high level of
quality and consistency. The engineering of our
manufacturing factory and its expansions has produced
a facility deliberately designed around large
capacity production, smooth efficient flow of
manufacturing processes, and adaptability to equipment
and product change. Throughout its design history,
manufacturing cost containment has been a key
element. Well-developed preventive maintenance
programs (PMP) assure the consistent on-time delivery
of Plenco products.
At all levels, our plant
operations utilize management practices and the
best available technology to maximize product
quality and minimize environmental impact. These
carefully planned efforts have reduced production
waste to levels approaching zero. The United States
Environmental Protection Agency has awarded Plenco
a Letter of Commendation in recognition of our
"voluntary initiative to reduce toxic emissions
and foster pollution prevention as the preferred
approach to environmental improvement."
|